Wednesday, 22 Feb 2017
Open house: Union Drive/Welch Road reconstruction
Provide feedback on two concepts for the reconstruction of Union Drive/Welch Road between Lincoln Way and Bissell Road in summer 2018.
Provide feedback on two concepts for the reconstruction of Union Drive/Welch Road between Lincoln Way and Bissell Road in summer 2018.